PSD Citywide

Share on

Join the PSD Citywide Newsletter

Get practical asset management and maintenance insights from people who work with municipalities every day.

Key Takeaways: 

  • Who: Public works, facilities, and fleet teams in cities, towns, and counties who need to be ready before the first snowfall
  • What: Six things to finish before winter, from pothole repair and roof checks to fleet winterization and public emergency maps
  • Benefit: Catch failures before a storm does, cut last-minute repair costs, and turn this year’s preparation into an automated schedule for next year

 

Winter tests every asset you own. PSD Citywide’s unified Enterprise Asset Management platform gives you full control over asset and maintenance management, so you’re ready before the first storm.

The fix is to find those problems in the fall, while repairs are not as expensive. Use these six steps to build your winter preparedness plan:

 

  1. Fix roads and sidewalks before the first freeze

Small road defects get bigger once water freezes inside them. Inspect roads and sidewalks in the fall. Patch potholes, seal cracks, and clear debris while the weather still allows it.

Next, build your snow and ice plan. Set priority routes for plowing, salting, and de-icing. Coordinate with your snow removal contractors and with any agencies that maintain roads connecting to yours.

Use GIS and maintenance management software to map priority routes and assign tasks to crews, so everyone works from the same plan when the first storm hits.

 

  1. Inspect and protect municipal buildings and spaces

Start with the roof on every municipal building. Check shingles, gutters, and structural components, and make repairs before snow builds up. Clogged gutters lead to ice dams, and weak structures can give way under heavy snow.

Next, get walkways ready. Clear leaves and branches, repair cracks and holes, and keep salt or sand close by. Once snow falls, clear roofs and overhangs quickly so snow and ice can’t slide onto people below.

In parking lots, mark curbs, islands, and other obstacles with stakes and reflective markers, and repair surface damage before plowing season. That way, plows can clear the lot without damaging it or the equipment.

Finally, inspect exterior equipment to confirm it meets capacity needs, then secure and winterize it.

 

  1. Winterize your fleet

Plows, tow trucks, and emergency vehicles have to start even on the worst day of the year. Check tire tread, antifreeze, headlights, wiper blades, mirrors, and battery health on every vehicle.

Park emergency vehicles in sheltered areas so snow and ice can’t block them in. Keep extra fuel and essential supplies on hand.

Don’t rely on memory or a whiteboard to keep this on track. Use Citywide Maintenance to automate preventive maintenance schedules, parts inventory, and inspection alerts for every vehicle, so your fleet stays ready all season, not just in November.

Related Article: The Real Cost of Neglecting Your Preventive Maintenance Schedule

 

  1. Winterize heating, plumbing, and insulation

Offices, community centers, and libraries get busier as the weather turns cold. Inspect HVAC systems, boilers, heaters, and pipes before heating season starts.

Check windows and weatherstripping for gaps and repair them so buildings stay warm and dry. Insulate pipes in unheated areas to avoid freezing and costly repairs.

Then set temperature floors. Never let spaces with water lines or fire sprinklers drop below 40°F (4°C). Aim for 55°F (13°C) in buildings with pipes in exterior walls, since those pipes run colder than the thermostat reading.

 

  1. Keep your community safe and informed

Some residents can’t leave home during heavy snow, high winds, or road closures. Plan for them first.

Publish emergency resources and preparedness guides on your website before winter starts. Keep printed copies in public buildings. If you expect a severe season, stock emergency kits in public spaces too.

Share your emergency plan with municipal departments, local businesses, emergency services, and community groups, and review it every year as your community grows and changes.

Plan for power outages, as they put residents at risk on the road and at home. Decide in advance how you’ll reach residents if power and internet go down, and who sends which updates.

Make the plan easy to find. Use Citywide GIS to publish public maps of warming centers, evacuation routes, and priority plow routes on your website. Update them with road closures and weather alerts as conditions change.

Related Article: Handle Citizen Work Orders Without Drowning Staff With a Municipal Request Portal

 

  1. Document your plan so you only build it once

Most teams rebuild their winter plan from scratch every fall, but you don’t have to. Record every winterization task, who owns it, and when it needs to happen.

In Citywide Maintenance, you save those tasks once, and they schedule themselves again next season. Crews complete inspections in the field on Citywide Mobile, so results go straight into the system instead of onto a clipboard. 

Related Article: Move from Clipboards to Cloud-Based Work Orders in 3 Steps

 

How PSD Citywide Can Help

PSD Citywide’s Enterprise Asset Management (EAM) platform puts your whole winter plan in one system.

  • Citywide Maintenance schedules preventive maintenance automatically and captures service requests from staff and residents.
  • Citywide Mobile lets crews complete work orders and inspections in the field.
  • Citywide Assets shows where every asset is, its full history, and how it changes over time.
  • Citywide GIS maps your assets and shares public maps on your website.

See how you can automate your winter inspection schedule.

More Articles

Construction worker with tablet managing digital work orders on busy public works street near heavy equipment, boosting municipal maintenance crew productivity.
Asset Management

Digital Work Order Management for Public Works

Key Takeaways: Who: Public Works and fleet teams struggling with paper-based processes and limited resources What: Digital work order management that replaces manual paperwork with

Become a Partner